Putts
Well-known member
Man, it feels like I've had this ceiling job hanging over my head forever.
Once the panels were all fit, they were all removed for paint and insulation.
Doubled up on the tables in the living room.
More awaiting in the hallway.
While the paint was drying I ran the wires for the ceiling lights.
One wire from the fuse/switch block, then you can see the heatshrink around the three way split to run the lights in parallel.
Of course, I don't want those cables chafing in the holes through the aluminum rafters, so they got a nice nylon cover.
I used Anderson Powerpoles for connectors. Good stuff.
Put up the ceiling panels that had the lights in them, connected them up, hit the switch....let there be light!
Once the panels were all fit, they were all removed for paint and insulation.
Doubled up on the tables in the living room.
More awaiting in the hallway.
While the paint was drying I ran the wires for the ceiling lights.
One wire from the fuse/switch block, then you can see the heatshrink around the three way split to run the lights in parallel.
Of course, I don't want those cables chafing in the holes through the aluminum rafters, so they got a nice nylon cover.
I used Anderson Powerpoles for connectors. Good stuff.
Put up the ceiling panels that had the lights in them, connected them up, hit the switch....let there be light!