Time for an update
The first project was a simple bed installed in a Pacifica
The floor slopes quite a bit so the legs are different lengths............Starr is happy
Tom had a broken roof rack on a classic bus..........................
It took 5 guys to lift/pry the rack straight and add a heavy piece of angle found in the donate pile........Just a couple bolts...........He'll have a WELDER look at it later
And Dianne wanted to remount a glass shelf in her van...........an Altar
I cut a fancy mounting strip on Ben's table saw
After mounting the bracket with screws and wood glue..............The tempered glass gets "caulked" in place and braced while curing
And the Becky van
Beckys diesel heat has been leaking..............stinky van.....everything has to go
After removing the carpet and pad and cleaning the floor...........we added only a few nailers with adhesive and some insulation
Next a new plywood floor got stapled to the nailers......a single piece of vinyl got cut and laid in a bed of mastic
and finally the finished vinyl..........finished off the doorway with a (no trim) waterfall edge........the board is a clamp till it dries..............Many thanks to KEN who worked the whole project...................
And Paulette finished and gave Debbie a beautiful Granny Square Afghan
Arrrrrrrgh