- Joined
- Feb 17, 2017
- Messages
- 1,950
- Reaction score
- 2,197
Point of Beginning:
https://vanlivingforum.com/threads/m-going-2-order-new-promaster.48208/
Well I ended up buying it off the lot vs ordering:
Yep, that’s me when I got it back to Kamp Koon on April 20. Next order of business was to read the manual and turn off everything I could that beeped, buzzed & flashed……..
Then I bought a real spare tire for the thing. Few days latter transferred 10,000$ into a new account accessed with a debit card for the build necessities. Have spent about 6 weex of the last 3 months working on it in one capacity or another.
The floor: ordered a Bedrug for it. When it arrived I used it as a template to size the 2 sheets of 3/4”4’x8’ plywood and it worked out great.
Installed thinsulate insulation; ceiling & sides.
Bought 1/2” 4’x8’ plywood; 4 ply not 3. Was only 2 more bux a sheet; also 12 2x2x8’ and started going to work. Much of the other wood I used was stuff I already had laying around.
Wanted the bed frame running lengthwise basically from the rear doors forward about 78”. Storage underneath; shelves for portable solar panel storage. Also propane tank & stove; 20 gallon water tank and spare tire storage under counter space to be on passenger side from side door to rear.
Some initial pix:
And after countertop installation was time for a christening. Thank you bottle of gin. No I didn’t break it on the van. Made me a couple gin&gingers.
jonny boi bringin more
https://vanlivingforum.com/threads/m-going-2-order-new-promaster.48208/
Well I ended up buying it off the lot vs ordering:
Yep, that’s me when I got it back to Kamp Koon on April 20. Next order of business was to read the manual and turn off everything I could that beeped, buzzed & flashed……..
Then I bought a real spare tire for the thing. Few days latter transferred 10,000$ into a new account accessed with a debit card for the build necessities. Have spent about 6 weex of the last 3 months working on it in one capacity or another.
The floor: ordered a Bedrug for it. When it arrived I used it as a template to size the 2 sheets of 3/4”4’x8’ plywood and it worked out great.
Installed thinsulate insulation; ceiling & sides.
Bought 1/2” 4’x8’ plywood; 4 ply not 3. Was only 2 more bux a sheet; also 12 2x2x8’ and started going to work. Much of the other wood I used was stuff I already had laying around.
Wanted the bed frame running lengthwise basically from the rear doors forward about 78”. Storage underneath; shelves for portable solar panel storage. Also propane tank & stove; 20 gallon water tank and spare tire storage under counter space to be on passenger side from side door to rear.
Some initial pix:
And after countertop installation was time for a christening. Thank you bottle of gin. No I didn’t break it on the van. Made me a couple gin&gingers.
jonny boi bringin more