Short work day today, only about 5 hours. My knees/legs are hurting from yesterday.
BUT, the laminate flooring is
done and looks really good.
tx2Sturgis, you were spot on regarding the tiles. All four tiles popped up, one cracked. And that was just 12 hours worth of traffic on them. Glad I found out now. I'm going go to rubber mat or carpet ... probably mat ... lighter, more flexible, easy on the feet [than tile].
The
Amazon Jungle issue was resolved, finally, thanks to some help from friends! Thank you, all of you ... you know who you are! The email from Amazon came in about 3am this morning and woke me up, so I grabbed the laptop and reordered all of the hardware again, upped the quality of the charge controller to a Blue Sky 3000i, and added a third 100 watt Renogy mono panel along with a cut off switch and a fuse block. All the components will be arriving in multiple shipments beginning 3/20 through 3/26.
Next up is some reinforcement work and the R6 poly-iso insulation. tx2sturgis ... I think I am going to keep the bolt system, albeit reinforced, but go to a hook and turnbuckle arrangement, attaching from the top of a roof beam to eye-bolts anchored on the 2X6 along the upper edge of the pod ... redundancy so I can sleep at night! LOL!
No new video today, just gunna relax and go out once in a while before it snows again to look at my new floor ... maybe snag about 3 fingers of some E&J brandy and watch the snowflakes fall.
L8R!