JeffJones
Active member
I will be in cold snow conditions as well as hot AZ. & Utah heat climates. The more I read the more confused I get on this. Any advise would be appreciated.
First layer on the metal van floor will be Reflextic with a 1/4-1/2" air gap.
Second layer with by the pink solid board, 1/2"
Third layer will be 1/2" plywood
Last will be vinyl flooring.
Does this sound like a good plan? Any suggestions
Thank you
First layer on the metal van floor will be Reflextic with a 1/4-1/2" air gap.
Second layer with by the pink solid board, 1/2"
Third layer will be 1/2" plywood
Last will be vinyl flooring.
Does this sound like a good plan? Any suggestions
Thank you