- Joined
- May 1, 2023
- Messages
- 479
- Reaction score
- 523
Well I finally started my build on the 8' x 18' trailer. This trailer is a redo build I totally gutted it and need to have it finished for the fall / winter season this is my home.
1st layer of insulation is complete 1". I will be starting the 2nd layer this week. Insulated floor, ceiling, & walls.
If anyone is interested I will post the cost of the build.
Insulation = 1200.00 2" of foam board. 1" layers going in opposite direction. Have to build the walls out 1".
1st layer of insulation is complete 1". I will be starting the 2nd layer this week. Insulated floor, ceiling, & walls.
If anyone is interested I will post the cost of the build.

Insulation = 1200.00 2" of foam board. 1" layers going in opposite direction. Have to build the walls out 1".