Ok, here is the setup I am looking at doing and I need some questions answered.
I have a hi-top (bubble top) E150
#1
I plan on putting 2x 100w flexible panels on the roof.
I will run an inline 15a MC4 fuse from + to a buss board in van cabinet
The negative will connect to a - buss board
#2
I will also have 2x 100w portable panels that I can setup outside when needed.
This will also be fused at the solar panels inline.
These will plug into side of van via 50' ext. cord
I will run + to same + buss board and - to same - buss board.
From the buss board I will run to mppt controller.
These are my questions. So do I run the roof panels in series and the portable in parallel?
Can these to be attached to the same buss terminal and than fed to charge controller?
Will I need a special charge controller for this setup or should a 40a CC work?
Any precautions I should take with this setup?
I have a hi-top (bubble top) E150
#1
I plan on putting 2x 100w flexible panels on the roof.
I will run an inline 15a MC4 fuse from + to a buss board in van cabinet
The negative will connect to a - buss board
#2
I will also have 2x 100w portable panels that I can setup outside when needed.
This will also be fused at the solar panels inline.
These will plug into side of van via 50' ext. cord
I will run + to same + buss board and - to same - buss board.
From the buss board I will run to mppt controller.
These are my questions. So do I run the roof panels in series and the portable in parallel?
Can these to be attached to the same buss terminal and than fed to charge controller?
Will I need a special charge controller for this setup or should a 40a CC work?
Any precautions I should take with this setup?