user 29503
Well-known member
- Joined
- Oct 14, 2020
- Messages
- 148
- Reaction score
- 14
Originally I was going to install the typical "1x2's screwed to the floor frame up" or a version of it for my floor, followed by plywood. However, would there be any fault in just putting down a 3/8' piece of plywood before laminate flooring going on top. I ask because my floor ribs/protrusions stick out about 3/8'' to 1/2" already, so I thought perhaps this would suffice had any water intrusion occurred. Please advise.
Thanks and safe travels,
Rabbit
Thanks and safe travels,
Rabbit